Well, now that we've moved in, there isn't so much going on here. I did want to show you the inside of the sun room. We used it over Christmas and put the tree out there, with the heater we were able to leave the doors wide open and really utilize the extra room. I am so going to love it when it warms up. We aren't bothering to heat it in this zero degree weather, the heater runs constantly to keep up but on sunny days, it's almost warm enough.

Monday, November 24, 2008



Finally, a pic of the back of the house! Now that the sunroom is finished it looks different. The deck & stairs are from the old house and the ramp from the front. This is all just temporary, as an emergency exit if necessary. Next summer I hope to have a deck across both rooms with a nice garden to look out on.

The big white thing on the left is the tub they took out of my bathroom. It was too small so we had the tiled shower installed instead. I already showed pics of that. The 4 season sunroom isn't getting much use in this 20degree weather. We just had the inside finished with knotty pine. We'll have to wait till spring to seal it. Once that's cleaned up we can install the gas heater and hopefully get some use of it on sunny days this winter.

Friday, November 14, 2008

Well, I think you can see that Olive has settled in quite well. She's in the guest bedroom. This room is beautiful with so much sunshine. I want to sun myself too! That is our camper you can see through the window. We still need to sell it.









On Monday Nov10 the mobile home was sold and moved out. This is how it looked going out of the driveway. I don't know how those drivers maneuver the way they do. That's 70' of the last 25 years going down the road. If it stops raining, I'll get pics of what the yard looks like now. The contractors have already laid the footings for the garage foundation.



Sunday, October 26, 2008

Home Sweet Home

We are finally moved in. We had family helping yesterday and got the kitchen emptied and a lot of "stuff" but it was too late to move the beds. So my sister got to christen our new home last night since the guest bedroom was all set up but tonight it's all ours. Even with boxes everywhere it is so comfortable, so beautiful and roomy, we are going to enjoy living here very much Unfortunately we've been too busy to take pictures so you'll just have to use your imagination for now.

Wednesday, October 22, 2008

Almost. . .

T minus seven days and counting. How many more little things can be done! Final cleaning was supposed to be Tues but the floor still needed work and the master bath shower still had work to be done so it was only half cleaned and now they will do final final cleaning tomorrow. Dryer still needs to be hooked up, missing a closet shelf, stuff like that. So we have been setting up the 2 spare rooms and today started with kitchen cupboards. Lots of trips back and forth. I think the kitchen still needs another coat of paint too. Despite all this we are planning to move in this weekend. You know what they say about best laid plans. . .

Wednesday, October 15, 2008





Well as usual the picture doesn't do it justice but this is the master shower and around the corner with the green wall is where the tub is. The multi-colored band around both is glass tile which matches the blue and green wall perfectly. It's so pretty.




You may know by now that we didn't make our move-in date of today. There is still a lot of "things" to be done including grouting this bath. The floor was finished today, appliances still need to be hooked up and lots of cleanup. Monday the heat was hooked up and we have water now too. The sunroom is finished. It is soooo nice. We went out to take a peek tonight and it was 73 in the sunroom and 55 outside. I'll have to take a picture to show you.
We do plan to start moving some things over this weekend into my craft room and the guest bedroom since there is nothing more to do there except hang closet doors.

Wednesday, October 8, 2008

Going Down!!!



Our elevator was installed today. It goes from the first floor to the basement. It was so smooth that I didn't know it was moving. Of course Doug beat me to the basement by the stairs but there will come a day when he is happy to have it too, I'm sure. I am happy to know that I can get things out of storage by my self. It's all about independence!

Monday, October 6, 2008

We have power!!

I couldn't believe it when I was still getting dressed this morning and Doug came in and said Public Service was in the yard hooking up the power! I wanted to cry I was so happy. Just Friday they told me it wouldn't be till the 15th or 16th. The elevator was installed today too. Now that we have power they can test it and then I can test it! The kitchen and living room floor are finished but the house was so cold that the adhesive wasn't sticking. Soon all the loose ends will be tied up. The final insulation is scheduled for 10/13 and after what .. . I hope we can start moving.

Tuesday, September 30, 2008

6 weeks and counting





It has now been 6 weeks, a lot has happened in the past 2 days but there is still so much more to do. It's starting to look like a house now. This is the master bedroom. brown/tan/blue combo looks really nice. The beige is the sitting room part of the bedroom. It is also the color of my craft room because I couldn't decide on another color.





The bathroom floor is tiled, and 1/2 of the roll in shower. Still need grout and waiting for the colored glass tile that goes in next. The painter and tiler will need to figure out who gets in there next. Good thing there's lots of room in there!



The sunroom is coming along nicely too. This is taken from the bedroom window today (looking out the window from the brown wall) If it doesn't rain it might be up by end of the week. Will still need flooring and wiring but one thing at a time!



Saturday, September 27, 2008

Naturally, there have been more delays, isn't there always? Painters were almost a week late but they were right at it yesterday and painted half the rooms. The bathroom will be tiled next week and of course there are so many other things. Namely PSHN. Why is everyone always waiting for them I wonder? Despite our contacting them awhile ago, it seems that at the last minute they want the poles replaced by the phone co. . . So that's the update for now.

Saturday, September 13, 2008

Our beautiful home!




This week things are looking more and more like a home. The "seams" were covered with sheetrock, and sanding will begin on Monday and hopefully painting will occur this week, with flooring the following week. It was quite a stressful week for me to pick colors (I did not want white walls!) and choose a floor that will hold up to my wheels. The carpenters finished the siding and the porch roof(s). The unfinished part on the left is waiting for the garage to be built. The appliances arrived but won't be installed till after the floors are done.

Great news is we sold the mobile home so that won't hold things up. Bad news this week is we lost the 80 acres behind us, we had bid at auction and the previous owner had a year to redeem it and he showed up at the very last minute with the money.



Doug is loving the new furnace. It's about a foot and a half square and will provide heat and hot water on demand. Love these new products! The entire house is energy star, it is very well insulated so we're hoping the heating costs won't be out of sight!



I love heading over everyday after the contractors leave and seeing what has been completed.

The kitchen is so big. I just love the cabinets - I chose mostly drawers for below and cupboards above. The center island is 4" lower then the main countertops and will be my worksurface. Lots of room for my wheels underneath too.

Saturday, August 23, 2008

The hugh crane got here 7am and against Dougs, advice drove to the front of the lot and buried the front wheels. Luckily Larry left the keys in the dozer and there was someone on site who knew how to drive it and pulled the crane out.
There was one hugh trailer used just to transport the counter weights for the crane. that alone took an hour to transfer. (I have a pic but this blog stuff stinks and I'm tired of trying to load them.)



Here they're swinging the 2nd half of the house onto the foundation, all 16'x 60' of house! The crane operator said one half weighed 25,000 lbs!





We couldn't believe how they manipulate the boxes onto the foundation, just push it right in place, well maybe not that simple but it was slick!











Here's the cross section of the kitchen. Isn't it beautiful?! Our daughter Karen designed the house and we couldn't be more happy. The morning sun will stream in through the french doors. That is a hugh island in the center sized just for me. (the posts in the center will be removed)

After 10 long hours of work - between the crane operator, trailer drivers, escorts, contractors, QC guys, marketing guy taking a video and a host of others who stopped by, we had a yard full. They had a hard working crew there, never even took a lunch break. So end of the first day it was all assembled and then covered with tarps. (how lucky we were to have beautiful weather after the past 6 weeks of rain!)

I just couldn't believe we finally will have a home that I can move around in without bumping into everything.




Here we are the end of day 2. What a difference!! The roof is almost complete. I still haven't been inside though. Although they can build a ramp, there are all kinds of materials on the floor inside. Tomorrow for sure! This is the backside, I have to say, this is my first time viewing the back, I didn't know Doug had taken this picture. It's beautiful and brought a tear to my eye.