Sunday, October 26, 2008
Home Sweet Home
Wednesday, October 22, 2008
Almost. . .
Wednesday, October 15, 2008
Wednesday, October 8, 2008
Going Down!!!
Monday, October 6, 2008
We have power!!
Tuesday, September 30, 2008
6 weeks and counting
The sunroom is coming along nicely too. This is taken from the bedroom window today (looking out the window from the brown wall) If it doesn't rain it might be up by end of the week. Will still need flooring and wiring but one thing at a time!
Saturday, September 27, 2008
Saturday, September 13, 2008
Our beautiful home!
This week things are looking more and more like a home. The "seams" were covered with sheetrock, and sanding will begin on Monday and hopefully painting will occur this week, with flooring the following week. It was quite a stressful week for me to pick colors (I did not want white walls!) and choose a floor that will hold up to my wheels. The carpenters finished the siding and the porch roof(s). The unfinished part on the left is waiting for the garage to be built. The appliances arrived but won't be installed till after the floors are done.
Great news is we sold the mobile home so that won't hold things up. Bad news this week is we lost the 80 acres behind us, we had bid at auction and the previous owner had a year to redeem it and he showed up at the very last minute with the money.
Doug is loving the new furnace. It's about a foot and a half square and will provide heat and hot water on demand. Love these new products! The entire house is energy star, it is very well insulated so we're hoping the heating costs won't be out of sight!
I love heading over everyday after the contractors leave and seeing what has been completed.
Saturday, August 23, 2008
Here's the cross section of the kitchen. Isn't it beautiful?! Our daughter Karen designed the house and we couldn't be more happy. The morning sun will stream in through the french doors. That is a hugh island in the center sized just for me. (the posts in the center will be removed)
After 10 long hours of work - between the crane operator, trailer drivers, escorts, contractors, QC guys, marketing guy taking a video and a host of others who stopped by, we had a yard full. They had a hard working crew there, never even took a lunch break. So end of the first day it was all assembled and then covered with tarps. (how lucky we were to have beautiful weather after the past 6 weeks of rain!)
Here we are the end of day 2. What a difference!! The roof is almost complete. I still haven't been inside though. Although they can build a ramp, there are all kinds of materials on the floor inside. Tomorrow for sure! This is the backside, I have to say, this is my first time viewing the back, I didn't know Doug had taken this picture. It's beautiful and brought a tear to my eye.
Wednesday, August 20, 2008
12 It's finally here!
Cellar Foundation
Thursday, August 7, 2008
10. Tree trimming
You can see how he teased the roots away from the cable with our electric lines. That's my herb garden to the left that is still intact too.



